Project · Uttar Pradesh
Blink Infra – Bhokapur: 125 kWp metal sheet rooftop solar in Uttar Pradesh
Generating since Jun 2026. An investor owns it under a PPA with Blink Infra; Adhvanik Energy built it and maintains it. It is one of 4 Blink Infra plants on our project list.
- Capacity
- 125 kWp
- Installation
- Metal sheet roof
- Location
- Bhokapur, Uttar Pradesh
- Finance model
- PPA (investor-owned)
This plant at a glance
- Client
- Blink Infra
- Industry
- Warehousing
- Capacity
- 125 kWp (DC), with 100 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Jun 2026
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by an investor.
At 125 kWp, the plant fits on a single roof or one section of a site, sized to one building's daytime load. Its 125 kWp of modules feed 100 kW of inverters, a DC/AC ratio of 1.25.
The plant has been running only since Jun 2026. The early question is whether output matches the design. Jun 2026 was a monsoon month, so early output ran under cloud.
For scale, the nearest match in capacity is Plastiblends – Palsana (125 kWp, Gujarat). New Jack Printing – Bhiwandi (375 kWp, Maharashtra) and Blink Infra – Sarai Sahjadi (300 kWp) were also commissioned in Jun 2026. In Uttar Pradesh, in order of commissioning, Blink Infra – Gaddipur comes before it and Blink Infra – Sarai Sahjadi after.
More on the area: Uttar Pradesh. It is also listed in the filterable project list.
Engineering
How a 125 kWp plant is put together
A shed roof in Bhokapur gives a 125 kWp plant plenty of room, but it asks more of the structure than a slab does. Sheet profile, purlin spacing and design wind speed decide how the rails are fixed, and the fixing has to leave the sheet watertight.
Before modules go on a sheet roof like the one at Blink Infra – Bhokapur, the roof assessment covers sheet age and corrosion and any turbo ventilators or skylights, and a structural engineer confirms the purlins. A leaking bay is re-sheeted first, because lifting modules off a roof later costs more than doing the job beforehand.
Our standard O&M scope has 24 to 26 cleaning cycles a year, more where the dust and the monsoon in Bhokapur call for them, with AI-enabled checks on cleaning quality.
Finance model
What an investor-owned PPA means here
The plant at Bhokapur is investor-owned. An investor paid for it and sells its electricity to the client under a PPA, while Adhvanik Energy was the EPC contractor and runs its O&M.
Because we built the plant and maintain it, its performance record is ours to keep.
Bhokapur
Warehousing plants in Uttar Pradesh
- Solar resource here
- 1,725 kWh/m² a yearAbout 1,457 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Bhokapur; a roof plant at roof tilt differs.
- Capacity range
- Under 250 kWp125 kWp here. 33 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- PPA (investor-owned)No capital from the factory: an investor owns the plant and the factory pays per unit.
This Bhokapur plant is the only Bhokapur plant on our list.
In Uttar Pradesh the list shows 4 projects in 4 towns. Named sectors include warehousing and FMCG.
A warehouse has a large roof and a modest daytime load from lighting, handling equipment and offices, so the plant is sized to what the building and its tenant use.
Ask whether the tenant or the building owner holds the electricity connection, because that decides who signs for the plant.
Sector pages: industries we work with.
Projects
Related plants
Elsewhere in Uttar Pradesh
- Blink Infra – Sarai Sahjadi300 kWp · Metal sheet roof · Jun 2026
- Blink Infra – Gaddipur250 kWp · Metal sheet roof · May 2026
- HUL – Orai1,131 kWp · Ground mount · Apr 2022
Other plants on metal sheet roofs
- Simplex Metal Processors – Pithampur, 500 kWpMetal sheet roof · Apr 2025
- Apple Flexipack – Indore565 kWp · Metal sheet roof · Apr 2025
- Mahyco – Buldhana621 kWp · Metal sheet roof · Apr 2025
- Samruddhi Industries – Sangli800 kWp · Metal sheet roof · Apr 2025
Common questions
Questions about Blink Infra – Bhokapur
Is 125 kWp the module or the inverter size at the plant?
The Blink Infra plant has 125 kWp of modules (DC) feeding 100 kW of inverters (AC). Modules are quoted in kWp and inverters in kW. As a ratio that is 1.25: the array is rated above the inverters, which cap what the plant can feed the site at any moment.
How is the plant at Bhokapur mounted?
The list records a metal sheet roof. On sheet the structure is fixed through the sheet or, for a zero-leakage roof, held by clamps or adhesive, and it is designed for the wind speed under IS 875.
Do you build plants in Uttar Pradesh?
Yes. One plant is listed for Bhokapur, among 4 in Uttar Pradesh. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 125 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
Terms used on this page
Free feasibility study
Want a 125 kWp plant on your own site?
The free 7-day study gives a site in Bhokapur an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.