Project · Rajasthan
Dabur – Newai: 480 kWp rooftop solar on two roof types in Rajasthan
Adhvanik Energy owns and runs it, and Dabur pays for each unit the plant generates, under a PPA. The plant has supplied the site since Mar 2024. It is one of 5 Dabur plants on our project list.
- Capacity
- 480 kWp
- Installation
- Metal sheet + RCC + Ground mount
- Location
- Newai, Rajasthan
- Finance model
- PPA / OPEX
Size, roof and finance model
- Client
- Dabur
- Industry
- FMCG
- Capacity
- 480 kWp (DC), with 375 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Mar 2024
- Status
- Operational. Owned and run by Adhvanik Energy.
A 480 kWp plant sits in the middle of the range we list: several inverters, on one site's roofs. 375 kW of inverters serve 480 kWp of modules: a DC/AC ratio of 1.28.
Since Mar 2024, the plant in Newai has run through several monsoons. That history is the first thing an O&M review reads. Its first readings, in Mar 2024, came in the dusty summer months.
For scale, the nearest match in capacity is Ronch Polymer – Daman (478 kWp, Dadra and Nagar Haveli and Daman and Diu). Its nearest neighbour in Rajasthan, in order of commissioning, is MYK Laticrete – Sotanala.
Solar in the area: Rajasthan. See it in the filterable project list.
Engineering
The engineering behind a plant like Dabur – Newai
A site with two roof types has buildings of two ages. The roof assessment looks at the sheet roofs for corrosion and purlin capacity and at the slabs for load margin, so each block carries the share of the 480 kWp that it can take.
Walkways differ by block: fixed paths on the sheet roofs, where the sheet was not built for foot traffic, and marked routes between rows on the slabs.
After commissioning, Asset Connect logs output and alerts, and a monthly report an engineer signs sets measured performance ratio against the design.
Finance model
How the plant is paid for
Under a PPA the client buys electricity from a plant we own. The tariff per unit is set in the contract, and the client pays only for the units the plant generates.
RESCO is the industry's name for this arrangement: a renewable energy service company that owns and operates the plant.
Newai
FMCG plants in Rajasthan
- Solar resource here
- 1,910 kWh/m² a yearAbout 1,645 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Newai; a roof plant at roof tilt differs.
- Capacity range
- 250 to 500 kWp480 kWp here. 36 plants on our list are in this range.
- Type of installation
- Metal sheet + RCC + Ground mountMetal sheet and RCC roofs, each with its own mounting.
- Finance option
- PPA / OPEXNo capital from the factory: it pays per unit generated.
Dabur – Newai is the only Newai plant on our list.
Rajasthan has 2 projects on the list, across 2 towns. By roof, 1 on metal sheet + RCC + Ground mount and 1 on a metal sheet roof.
FMCG sites tend to run packing and dispatch in daylight hours, which lines up with when a solar plant generates.
Warehouses and packing halls give long runs of clear roof, which keeps the array simple.
Sector page: FMCG solar.
Projects
Other plants on the list
Elsewhere in Rajasthan
- MYK Laticrete – Sotanala201 kWp · Metal sheet roof · Mar 2026
Other FMCG plants
- HUL – Haridwar, 64 kWpGround mount
- Exotic Fruits – Krishnagiri1,009 kWp · Metal sheet roof · Aug 2026
- HUL – Haridwar, 332 kWpMetal sheet roof · Jul 2026
- Exotic Fruits – Nashik1,332 kWp · Metal sheet roof · Jul 2026
Common questions
What people ask about this plant
When was the plant commissioned?
Our list records Mar 2024. Module degradation and wear on inverters and cables now show in the record.
Who maintains this Newai plant?
Adhvanik Energy owns and runs the plant. The client pays for each unit the plant generates, at the tariff in its contract, and our O&M team looks after the plant.
How do I find out if my roof can carry 480 kWp?
Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.
Guides and glossary
Guides and terms behind a 480 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Behind-the-meter or net metering: which suits your site?Read the guide
Terms used on this page
Free feasibility study
Want a 480 kWp plant on your own site?
Send your Rajasthan town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.