Project · Bihar
Britannia – Hajipur: 1,050 kWp metal sheet rooftop solar in Bihar
Generating since Oct 2025. Britannia bought the plant under CAPEX and owns it. It is one of 8 Britannia plants on our project list.
- Capacity
- 1,050 kWp
- Installation
- Metal sheet roof
- Location
- Hajipur, Bihar
- Finance model
- CAPEX
Plant details
- Client
- Britannia
- Industry
- FMCG
- Capacity
- 1,050 kWp (DC), with 825 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Oct 2025
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
From 1,000 kW of capacity upward, a plant is usually built in many blocks, each with its own inverter. The plant is in that class. The array is 27% larger than the inverters, a DC/AC ratio of 1.27.
The Britannia plant began supplying the site in Oct 2025. With a full year on record, a month that falls short of the same month last year stands out. Oct 2025 came just after the monsoon, a clear-sky start.
For scale, the nearest match in capacity is Britannia Manna Foods – Madurai (1,050 kWp, Tamil Nadu). Its nearest neighbour in Bihar, in order of commissioning, is Britannia – Bihta.
More on the area: Bihar. Find this plant in the projects index.
Engineering
The engineering behind a plant like Britannia – Hajipur
Putting 1,050 kWp on sheet means respecting a roof built to keep rain out and carry little else. The rails spread the array's weight across several purlins, and the design is checked against wind uplift for the site.
Edge protection, lifelines and fixed walkways are part of the design, because crews work on a surface not built for foot traffic. The same arrangements serve the cleaning team for as long as a 1,050 kWp plant runs.
Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.
Finance model
Who owns the plant, and who runs it
This Hajipur plant was financed as CAPEX: the client paid for the plant and owns it from day one. Every unit it generates replaces a unit bought from the grid, and the saving is the client's.
After handover, the owner placed day-to-day care of the plant with our O&M team under contract.
Hajipur
FMCG plants in Bihar
- Solar resource here
- 1,719 kWh/m² a yearAbout 1,441 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Hajipur; a roof plant at roof tilt differs.
- Capacity range
- 1,000 kWp and above1,050 kWp here. 19 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
The plant is the only Hajipur plant on our list.
In Bihar the list shows 2 projects in 2 towns. Named sectors include FMCG.
Consumer-goods lines such as filling, packing and conveying run through the day shift, so a roof plant produces when the load is already there.
The sizing question is how much the lines run on Sundays and shutdown days, because surplus on those days depends on the connection.
Sector page: FMCG solar.
Projects
Other plants on the list
Elsewhere in Bihar
- Britannia – Bihta1,600 kWp · Metal sheet roof · Nov 2025
Other plants on metal sheet roofs
- Pearl Global – Chennai360 kWp · Metal sheet roof · Feb 2026
- Pidilite – Kala Amb, 312 kWpMetal sheet roof · Jan 2026
- Pidilite – Kala Amb, 537 kWpMetal sheet roof · Jan 2026
- Pidilite – Kala Amb, 205 kWpMetal sheet roof · Jan 2026
Common questions
Questions about Britannia – Hajipur
Is 1,050 kWp the module or the inverter size at the Britannia plant?
The plant carries 1,050 kWp of modules and 825 kW of inverter capacity. kWp is the module rating at test conditions, and kW (AC) is what the inverters can deliver. As a ratio that is 1.27: the array is rated above the inverters, which cap what the plant can feed the site at any moment.
What does the roof mean for the 1,050 kWp plant at Hajipur?
The list records a metal sheet roof. On sheet the structure is fixed through the sheet or, for a zero-leakage roof, held by clamps or adhesive, and it is designed for the wind speed under IS 875.
Is Hajipur within your reach for a new plant?
Yes. One plant is listed for Hajipur, among 2 in Bihar. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 1,050 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Free feasibility study
Want a 1,050 kWp plant on your own site?
Send your Bihar town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.