Mahyco – Buldhana: 621 kWp metal sheet rooftop solar in Maharashtra

Generating since Apr 2025. Mahyco bought the plant under CAPEX and owns it. It is one of 2 Mahyco plants on our project list.

Capacity
621 kWp
Installation
Metal sheet roof
Location
Buldhana, Maharashtra
Finance model
CAPEX

Plant details

Client
Mahyco
Industry
Agro
Capacity
621 kWp (DC), with 475 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Apr 2025
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

At 621 kWp, a plant is generally built from blocks, each with its own inverter, so a fault stays local. 475 kW of inverters serve 621 kWp of modules: a DC/AC ratio of 1.31.

With a commissioning month of Apr 2025, the plant has a year or more of readings, enough to compare each month with the same month a year earlier. Apr 2025 put its first months in the hot, dusty season.

The plant closest to it in size on our list is FUSO Glass – Hyderabad (630 kWp, Telangana). Apple Flexipack – Indore (565 kWp, Madhya Pradesh) and Samruddhi Industries – Sangli (800 kWp) were also commissioned in Apr 2025. In Maharashtra, in order of commissioning, Samruddhi Industries – Sangli comes before it and Hexagon Prints – Palghar after.

Engineering

What a metal sheet rooftop plant involves

Putting 621 kWp on sheet means respecting a roof built to keep rain out and carry little else. The rails spread the array's weight across several purlins, and the design is checked against wind uplift for the site.

Edge protection, lifelines and fixed walkways are part of the design, because crews work on a surface not built for foot traffic. The same arrangements serve the cleaning team for as long as a 621 kWp plant runs.

Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.

Finance model

What CAPEX means here

The CAPEX route puts ownership with the client from the day of commissioning in Apr 2025. The plant is the owner's asset, and the owner decides how it is maintained and for how long.

CAPEX suits a company that plans to stay at a site for the life of the plant. Our financing page compares it with PPA / OPEX.

Buldhana

Buldhana and the agro sector

Solar resource here
1,946 kWh/m² a yearAbout 1,630 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Buldhana; a roof plant at roof tilt differs.
Capacity range
500 to 1,000 kWp621 kWp here. 38 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

The list has one plant in Buldhana, and this is it.

In Maharashtra the list shows 44 projects in 17 towns. Named sectors include electrical and electronics; agro; automotive; polymer.

Agricultural processing follows the harvest, so load rises in season and drops outside it, and the plant is sized against the whole year and not the peak.

Ask for several years of monthly bills, because a seasonal load makes a single year misleading.

Projects

More plants near Buldhana

Elsewhere in Maharashtra

Other plants on metal sheet roofs

Common questions

Questions about Mahyco – Buldhana

What does 621 kWp mean for Mahyco – Buldhana?

The plant has 621 kWp of modules (DC) feeding 475 kW of inverters (AC). Modules are quoted in kWp and inverters in kW. As a ratio that is 1.31: the array is rated above the inverters, which cap what the plant can feed the site at any moment.

How is the plant at Buldhana mounted?

Metal sheet, per the list. On a roof like that the mounting is chosen per roof, and sheet condition is checked before any module goes on.

Do you build plants in Maharashtra?

Yes. One plant is listed for Buldhana, among 44 in Maharashtra. The free 7-day feasibility study needs only your town and a typical monthly bill.

Free feasibility study

Find out what your sheds can carry

Send your Maharashtra town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.

Call us+91 22 4618 3484Get a free feasibility study