Project · Himachal Pradesh
Pidilite – Baddi: 97 kWp metal sheet rooftop solar in Himachal Pradesh
Pidilite bought the plant under CAPEX and owns it. The plant has supplied the site since Dec 2025. It is one of 5 Pidilite plants on our project list.
- Capacity
- 97 kWp
- Installation
- Metal sheet roof
- Location
- Baddi, Himachal Pradesh
- Finance model
- CAPEX
This plant at a glance
- Client
- Pidilite
- Industry
- Chemicals
- Capacity
- 97 kWp (DC), with 100 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Dec 2025
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
At 97 kWp, the plant fits on a single roof or one section of a site, sized to one building's daytime load. At a DC/AC ratio of 0.97, the inverters seldom run at their limit.
Running since Dec 2025, the plant has been through a summer and a monsoon. Its seasonal pattern is now visible. Dec 2025 fell in the low-sun winter months.
Closest in capacity on the list: MTC – Bidadi (100 kW (AC), Karnataka). Dec 2025 also saw Pidilite – Baddi (227 kWp) and NDR Warehousing – Pune (100 kWp, Maharashtra) commissioned. Of the Himachal Pradesh plants on our list, HUL – Nalagarh was commissioned just before it and Pidilite – Baddi, 227 kWp just after.
More on the area: Himachal Pradesh · Baddi and Kala Amb. See it in the filterable project list.
Engineering
How a 97 kWp plant is put together
Pidilite – Baddi is one of the metal sheet roof plants on our list. On a shed in Himachal Pradesh, the mounting is chosen for the sheet profile and designed to comply with OEM installation guidelines.
Shadows on a shed roof come from ridge monitors, ventilators and neighbouring buildings. The layout for a plant like the plant is drawn with those in place, so no row loses output to a shadow that was visible on the first day.
Our standard O&M scope has 24 to 26 cleaning cycles a year, more where the dust and the monsoon in Baddi call for them, with AI-enabled checks on cleaning quality.
Finance model
How the plant is paid for
Under CAPEX the owner buys the plant outright and controls it for its whole life. That suits a company with capital to deploy and a long horizon at the site, which describes the client at the Pidilite plant since Dec 2025.
After handover, the owner placed day-to-day care of the plant with our O&M team under contract.
Baddi
Chemicals plants in Himachal Pradesh
- Solar resource here
- 1,735 kWh/m² a yearAbout 1,520 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Baddi; a roof plant at roof tilt differs.
- Capacity range
- Under 250 kWp97 kWp here. 33 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
Besides this Baddi plant, our list has 2 other plants in Baddi. Sectors named there: chemicals and pharma.
Baddi is covered on the page for Baddi and Kala Amb, which lists 6 plants.
In Himachal Pradesh the list shows 7 projects in 3 towns. Named sectors include chemicals, FMCG and pharma.
Process plants in chemicals draw power around the clock, and the daytime share is what a roof plant can serve.
RCC blocks and sheds both appear in chemical works, and the plant is placed where the roof is clear of vents and process stacks.
Sector pages: industries we work with. Rules for Himachal Pradesh: solar policy.
Projects
More plants near Baddi
Also in Baddi
- Pidilite – Baddi, 227 kWpMetal sheet roof · Dec 2025
- FDC – Baddi332 kWp · RCC · Sep 2021
Elsewhere in Himachal Pradesh
- Pidilite – Kala Amb, 312 kWpMetal sheet roof · Jan 2026
- HUL – Nalagarh46 kWp · RCC · Jul 2023
Other plants on metal sheet roofs
- SAPCO – Mumbai531 kWp · Metal sheet roof · Apr 2025
- Hexagon Prints – Palghar350 kWp · Metal sheet roof · Apr 2025
- Simplex Metal Processors – Pithampur, 500 kWpMetal sheet roof · Apr 2025
- Apple Flexipack – Indore565 kWp · Metal sheet roof · Apr 2025
Common questions
Questions about Pidilite – Baddi
What is the commissioning date of the Pidilite – Baddi plant?
The Pidilite plant was commissioned in Dec 2025 and has supplied the site since then. With a full year on record, a month that falls short of the same month last year stands out.
Who owns the Pidilite – Baddi plant?
Ownership sits with the client under CAPEX. We designed and built the plant, and our O&M team maintains it.
Could a plant like this Baddi plant fit my factory?
Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.
Guides and glossary
Guides and terms behind a 97 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide