Maharashtra

Industrial rooftop solar in Nagpur

3 plants in the centre of Vidarbha, commissioned between 2021 and 2024: electrical and electronics, agro and general industry, one of them with a solar carport.

projects listed here in Nagpur
3
plants built on CAPEX
3
industries named
2
most recent commissioning
Sep 2024

The industrial belt

Vidarbha heat and the MIHAN belt

Nagpur is the commercial and political centre of Vidarbha, the eastern part of Maharashtra, and it is a long way from the sea. The climate is tropical wet and dry: summers run from March to June with May the hottest month, the record high is 47 °C (30 May 2024), and July is the wettest month at about 294 mm.

Industry sits in and around the city. MIHAN, the multi-modal hub built around the airport, hosts a TCS campus and manufacturing sites of Dassault Reliance Aerospace, Thales Reliance Defence Systems and Lupin. Butibori, an MIDC industrial suburb in Nagpur district, has about 100 operating industries and a food park. Our project list names the city, so none of the plants below is tied to MIHAN or Butibori.

For a roof here the heat deserves more attention than the rain. Modules lose output as they warm, so the hottest months are the ones to examine in any yield estimate.

Sources: Nagpur (opens in a new tab), Butibori (opens in a new tab). As of Nov 2026.

Our plants here

Three plants, one with a carport

3 plants listed here, from 721 kWp, 477 kWp and 200 kWp, commissioned between 2021 and 2024. The sectors are agro and electrical and electronics, plus one general industrial plant, and all 3 were built on a CAPEX basis.

The largest stands on an RCC roof and a carport. A carport array carries its own steel and foundations, so ask for it priced as a separate line from the roof work.

By roof: 2 on metal sheet roofs and 1 on Carport. Metal sheet gets hot in a Vidarbha May, and a hot roof warms the modules above it. Ask how much air gap the mounting leaves and what module temperature the estimate assumes for the summer months.

What to check first

Before you size a Nagpur roof

  1. 01

    May against July

    Ask for a month-by-month estimate. May is the hottest month and July the wettest, and they pull the yield in different directions.

    Guide: performance ratio
  2. 02

    Carport or roof

    If the roof is full, parked-vehicle bays can carry modules too. Ask for that option priced on its own.

    Solar carports
  3. 03

    Slab or sheet

    On either roof, a structural engineer (yours, or one we refer) confirms it can carry the plant: the slab and waterproofing on RCC, the purlins on metal sheet. Ask which one your proposal assumes.

    RCC roof solar
  4. 04

    What your connection allows

    What happens to surplus power depends on the connection. Read the state position before the size is fixed.

    Maharashtra solar policy

Common questions

What Nagpur factories ask before they buy

Speak with an industrial solar engineer
Do you build at MIHAN or in Butibori?

Our Nagpur plants are listed by city, so none is tied to an estate. If your factory is in MIHAN, Butibori or another industrial area, send your town and average monthly bill; that is what the free 7-day feasibility study starts from.

How hot does Nagpur get, and does it hurt a solar plant?

Summers run from March to June, and the record is 47 °C in May 2024. Modules produce less when they are hot, which is why a monthly yield estimate tells you more than an annual one.

Can solar go over a factory car park in Nagpur?

Yes. One of the plants listed here combines an RCC roof with a carport. The carport page explains when the extra steel is worth it.

Solar carports

Which sectors and finance models are the Nagpur plants?

Agro and electrical and electronics, plus a general industrial plant. All 3 were built on CAPEX. A PPA is available where a factory would rather not spend capital.

Compare CAPEX and PPA for your factory

Is there an Adhvanik engineer near my factory in Nagpur?

Our team includes people based in Nagpur. Send your town and an average monthly bill, and an engineer replies within 48 hours; the free 7-day feasibility study starts from those two details.

Speak with an industrial solar engineer

Free feasibility study

Nagpur factory? Ask for the May and July estimate

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
Call us+91 22 4618 3484Get a free feasibility study