Maharashtra

Industrial rooftop solar in Baramati and Shrirampur

3 plants under one name: two phases at Shrirampur about ten months apart, then a unit at Baramati three weeks after the second.

projects listed here in Baramati and Shrirampur
3
places with a plant
2
most recent commissioning
Jul 2026

The industrial belt

Cane fields, a canal and two districts

Baramati is a city and tehsil in Pune district, on the Deccan plateau at about 538 m. Its MIDC industrial area covers 800 hectares along the Baramati-Bhigwan road, and a 60-acre hi-tech textile park hosts garment, printing and technical-textile units. Piaggio's three-wheeler plant and food companies such as Ferrero and Dynamix Dairy are there as well. Under the factories the local economy is farming: sugarcane first, then grapes, jowar, cotton and wheat, watered by the Nira Left Canal and the Nira and Karha rivers.

Shrirampur lies in Ahmednagar district, renamed Ahilyanagar, which has more sugar factories than any other district in Maharashtra and an average annual rainfall of about 501 mm. Baramati receives about 531 mm, falling on about 31 days a year, between June and September.

With rain on so few days, most of the year is dry-season sun, and the useful questions are about heat and dust. May is Baramati's hottest month, with a mean daily maximum near 38.8 °C and a record of 43.8 °C. Shrirampur's warmest months are April and May. Our list names the town and leaves out the estate.

Sources: Baramati (opens in a new tab), Shrirampur, Maharashtra (opens in a new tab), Ahilyanagar district (opens in a new tab). As of Nov 2026.

Our plants here

Phase one, phase two and a neighbouring unit

3 plants listed here, and all three carry the same name. Shrirampur has an entry labelled phase 1 (729 kWp, Aug 2025) and one labelled phase 2 (578 kWp, Jul 2026). The Baramati unit (771 kWp) was commissioned in Jul 2026.

All three are tagged general industrial, none has a roof type recorded, and all were built on a CAPEX basis. They fall in one size band, 771 kWp, 729 kWp and 578 kWp.

For a buyer the point is sequence. A phase two is easier to connect when phase one left room for more inverters, spare cable routes and a metering arrangement that can take the added load.

What to check first

Settle these before a second phase

  1. 01

    Room left for phase two

    Decide where the extra inverters and cable route will go before the first phase is built.

    Industrial solar solutions
  2. 02

    Same meter or a new one

    Ask whether a second phase sits behind the existing meter or needs its own connection, and who approves it.

    Guide: behind the meter or net metering
  3. 03

    A seasonal load

    If the plant runs harder in one season, such as a crushing or harvest season, size against the quiet months as well as the busy ones.

    Guide: reading your electricity bill
  4. 04

    Roof used up, land free

    When the roof is full, a ground-mount array on spare land can take the next phase.

    Ground-mount solar

Common questions

What Baramati and Shrirampur factories ask before they buy

Speak with an industrial solar engineer
Do you build in the Baramati MIDC area?

Our plants are listed by town, so none is tied to an estate. If your factory is in the MIDC area or elsewhere around Baramati, send your town and average monthly bill; the free 7-day feasibility study begins with those.

Can a second phase be added to a plant built earlier?

Yes. The two Shrirampur entries are phase 1 and phase 2 of one plant. Tell us the first plant's inverter make, capacity and metering arrangement, and the design starts from what is already on the roof.

Does low rainfall change the design here?

Baramati gets about 531 mm a year, so soiling between rains is the practical issue. Ask what cleaning interval the yield estimate assumes.

Were these plants CAPEX or PPA?

Of the plants we built, 3 were CAPEX. The financing pages compare the two, and the free study gives you an ROI sheet and a budgetary quote for your roof.

Compare CAPEX and PPA for your factory

What should a cattle-feed or agro plant check about its load?

Check whether the plant runs harder in a season, such as a crushing or harvest season, and size against the quiet months as well as the busy ones. Read your bill by month and by time-of-day band before the plant is sized.

Reading your electricity bill

Who covers Baramati and Shrirampur for site visits and enquiries?

Our team includes people based in Pune. Whatever your town, the first step is the same: your location and a recent electricity bill. An engineer replies within 48 hours.

Speak with an industrial solar engineer

Free feasibility study

Adding a second phase? Send the first plant's details

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
Call us+91 22 4618 3484Get a free feasibility study