Project · O&M only · Gujarat

Plastiblends – Palsana: 223 kWp solar plant in Gujarat, maintained by Adhvanik

Plastiblends' plant in Palsana was built by another company, and our O&M engineers maintain it. It is one of 6 Plastiblends plants on our project list.

Capacity
223 kWp
Installation
Metal sheet roof
Location
Palsana, Gujarat
Service
O&M only

Plant details

Client
Plastiblends
Industry
Polymer
Capacity
223 kWp (DC), with 200 kW (AC) of inverters
Commissioned
Jul 2022
Status
Built by another company. Adhvanik Energy maintains it. O&M only

223 kWp is mid-sized for the list, enough to span a production hall or two. 200 kW of inverters serve 223 kWp of modules: a DC/AC ratio of 1.12.

Since Jul 2022, the plant in Palsana has run through several monsoons. That history is the first thing an O&M review reads. Jul 2022 falls in the monsoon.

Closest in capacity on the list: Pidilite – Baddi (227 kWp, Himachal Pradesh). Jul 2022 also saw Plastiblends – Palsana (463 kWp) and Lemken – Nagpur (477 kWp, Maharashtra) commissioned.

O&M

What taking over a plant involves

The original build at Plastiblends – Palsana is another company's work. What we take on is the plant as it stands: its modules, inverters and cabling, and the generation record that shows how it is doing.

A plant that has drifted shows it in performance ratio: soiling, a failed string or an inverter fault each take a share of output. Asset Connect puts that number in front of our engineers every month.

Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.

Finance model

What O&M only means here

Our relationship with Plastiblends – Palsana is maintenance. Who financed the plant is a matter between its owner and its builder.

An AMC is an annual maintenance contract. Ours covers inspection, repair response and monitoring on Asset Connect.

Palsana

Polymer plants in Gujarat

Solar resource here
1,931 kWh/m² a yearAbout 1,614 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Palsana; a roof plant at roof tilt differs.
Capacity range
Under 250 kWp223 kWp here. 33 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Service
O&M onlyOne team accountable for output, with a monthly report.

We list 3 plants in Palsana, and the plant is one of them. The sector named there is polymer.

Palsana is covered on the page for Surat and Palsana, which lists 5 plants.

In Gujarat the list shows 12 projects in 7 towns. Named sectors include polymer; electrical and electronics; FMCG; packaging and printing.

Polymer processing is power-hungry and often continuous, so much of what a plant generates is used on site.

Polymer works often occupy long sheds, which suit straight rows and simple cable routes.

Projects

More plants near Palsana

Also in Palsana

Elsewhere in Gujarat

Other plants we maintain but did not build

Common questions

The Plastiblends – Palsana plant: questions and answers

What is the commissioning date of the Plastiblends – Palsana plant?

This Palsana plant was commissioned in Jul 2022 and has supplied the site since then. Module degradation and wear on inverters and cables now show in the record.

Who looks after the 223 kWp plant at Palsana?

The plant belongs to its owner and was built by another company. Maintenance is ours: monitoring on Asset Connect, inspections and fault response.

How do I find out if my roof can carry 223 kWp?

Only a check of your own site can say. The free 7-day feasibility study covers roof feasibility and the area available, a financial ROI sheet and a budgetary quote.

Free feasibility study

Find out what your sheds can carry

A 223 kWp plant is one data point. The free 7-day study gives you the numbers for your own site.

Call us+91 22 4618 3484Get a free feasibility study