Project · Maharashtra

Soma Resort – Nashik: 83 kWp metal sheet rooftop solar in Maharashtra

Soma Resort bought the plant under CAPEX and owns it. The plant has supplied the site since Feb 2020. It is one of 2 Soma Resort plants on our project list.

Capacity
83 kWp
Installation
Metal sheet roof
Location
Nashik, Maharashtra
Finance model
CAPEX

This plant at a glance

Client
Soma Resort
Industry
Hospitality
Capacity
83 kWp (DC), with 72 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Feb 2020
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

At 83 kWp, the plant fits on a single roof or one section of a site, sized to one building's daytime load. 72 kW of inverters serve 83 kWp of modules: a DC/AC ratio of 1.15.

The Soma Resort plant has been generating since Feb 2020. Its record shows how a plant in Maharashtra holds up through many seasons. Its first readings, in Feb 2020, met the longest winter shadows.

The plant closest to it in size on our list is Plastiblends – Daman (67 kWp, Dadra and Nagar Haveli and Daman and Diu). Its nearest neighbour in Maharashtra, in order of commissioning, is MTC – Pune.

Engineering

How an 83 kWp plant is put together

For the metal sheet roof at Soma Resort – Nashik, the starting point is the sheet itself: its make, profile, thickness and age. Those four facts tell the engineer whether clamps or adhesive fit, and how many years of life the roof has left under the array.

Shadows on a shed roof come from ridge monitors, ventilators and neighbouring buildings. The layout for a plant like the plant is drawn with those in place, so no row loses output to a shadow that was visible on the first day.

Asset Connect keeps generation, irradiance and alerts in one place, and a drop in performance ratio is the first sign that a string, an inverter or the module surface needs attention.

Finance model

What CAPEX means here

At this Nashik plant the client carried the capital cost of the 83 kWp plant, which makes it a CAPEX project. The generation is the client's from the first unit, offsetting what the site would buy from its distribution company.

Compared with a PPA, CAPEX needs money up front and leaves the plant with the owner. Ask for both prices on the same roof.

Nashik

Hospitality plants in Maharashtra

Solar resource here
1,935 kWh/m² a yearAbout 1,622 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Nashik; a roof plant at roof tilt differs.
Capacity range
Under 250 kWp83 kWp here. 33 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

Besides the plant, our list has 4 other plants in Nashik. Sectors named there: hospitality; electrical and electronics; FMCG.

Nashik is covered on the page for Nashik and Sinnar, which lists 7 plants.

Across Maharashtra our list holds 44 plants in 17 towns, commissioned between 2020 and 2026.

Resorts run air conditioning, kitchens and water pumps in daylight hours, the load a rooftop plant serves best.

Resort buildings are often spread out, so the plant may sit across several smaller roofs rather than one large one.

Projects

Related plants

Also in Nashik

Elsewhere in Maharashtra

Other plants on metal sheet roofs

Common questions

Questions about Soma Resort – Nashik

What is the commissioning date of the Soma Resort – Nashik plant?

This Nashik plant was commissioned in Feb 2020 and has supplied the site since then. Its record shows how a plant in Maharashtra holds up through many seasons.

Who looks after the 83 kWp plant at Nashik?

The client owns it, because the Soma Resort plant was financed as CAPEX. Adhvanik Energy built the plant and maintains it under an O&M contract.

How do I find out if my roof can carry 83 kWp?

It depends on the roof or land, the load and the connection. The free 7-day feasibility study includes a roof feasibility check, the area available for installation and a financial ROI sheet for your site.

Free feasibility study

Find out what your sheds can carry

Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.

Call us+91 22 4618 3484Get a free feasibility study