MYK Laticrete – Sotanala: 201 kWp metal sheet rooftop solar in Rajasthan
Generating since Mar 2026. MYK Laticrete bought the plant under CAPEX and owns it. It is one of 5 MYK Laticrete plants on our project list.
- Capacity
- 201 kWp
- Installation
- Metal sheet roof
- Location
- Sotanala, Rajasthan
- Finance model
- CAPEX
Size, roof and finance model
- Client
- MYK Laticrete
- Capacity
- 201 kWp (DC), with 150 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Mar 2026
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
At 201 kWp, the plant covers a sizeable share of a factory roof, usually split across a few inverters. Its 201 kWp of modules feed 150 kW of inverters, a DC/AC ratio of 1.34.
Commissioned in Mar 2026, the plant is recent. Its early months set the performance-ratio baseline. Its first readings, in Mar 2026, came in the dusty summer months.
The plant closest to it in size on our list is Sansera Engineering – Manesar (201 kWp, Haryana). Pearl Global – Bengaluru (637 kWp, Karnataka) was also commissioned in Mar 2026. Its nearest neighbour in Rajasthan, in order of commissioning, is Dabur – Newai.
On the location pages: Rajasthan. It is also listed in the full project list.
Engineering
The engineering behind a plant like MYK Laticrete – Sotanala
Putting 201 kWp on sheet means respecting a roof built to keep rain out and carry little else. The rails spread the array's weight across several purlins, and the design is checked against wind uplift for the site.
Edge protection, lifelines and fixed walkways are part of the design, because crews work on a surface not built for foot traffic. The same arrangements serve the cleaning team for as long as a 201 kWp plant runs.
After commissioning, Asset Connect logs output and alerts, and a monthly report an engineer signs sets measured performance ratio against the design.
Finance model
Who owns the plant, and who runs it
CAPEX is the model where the client buys the plant. For the MYK Laticrete plant, that means the 201 kWp system is the client's property since Mar 2026, with the savings and the upkeep decisions on the client's side.
We design, procure, build and commission a CAPEX plant, then hand it over. A 1-year defect liability period covers the entire installation, we handle manufacturer warranty claims, and the owner can sign an O&M contract of up to 25 years.
Sotanala
The area around MYK Laticrete – Sotanala
- Solar resource here
- 2,005 kWh/m² a yearAbout 1,737 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Sotanala; a roof plant at roof tilt differs.
- Capacity range
- Under 250 kWp201 kWp here. 33 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
The list has one plant in Sotanala, and this is it.
Across Rajasthan our list holds 2 plants in 2 towns, commissioned between 2024 and 2026.
Sector pages: industries we work with.
Projects
Related plants
Elsewhere in Rajasthan
- Dabur – Newai480 kWp · Metal sheet + RCC + Ground mount · Mar 2024
Other plants on metal sheet roofs
- Mysore Deep Perfumery – Indore266 kWp · Metal sheet roof · May 2025
- SAPCO – Mumbai531 kWp · Metal sheet roof · Apr 2025
- Hexagon Prints – Palghar350 kWp · Metal sheet roof · Apr 2025
- Simplex Metal Processors – Pithampur, 500 kWpMetal sheet roof · Apr 2025
Common questions
The MYK Laticrete – Sotanala plant: questions and answers
How big is the MYK Laticrete – Sotanala plant?
Two figures describe this Sotanala plant: 201 kWp on the module side and 150 kW (AC) on the inverter side. That is 34% more module capacity than inverter capacity (ratio 1.34), a normal design choice.
What does the roof mean for the 201 kWp plant at Sotanala?
The list records a metal sheet roof. On sheet the structure is fixed through the sheet or, for a zero-leakage roof, held by clamps or adhesive, and it is designed for the wind speed under IS 875.
Does Adhvanik Energy work near Sotanala?
Yes. One plant is listed for Sotanala, among 2 in Rajasthan. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 201 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Behind-the-meter or net metering: which suits your site?Read the guide
Terms used on this page
Free feasibility study
Plan a plant for your own Rajasthan site
Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.