Project · Tamil Nadu

Exotic Fruits – Krishnagiri: 1,009 kWp metal sheet rooftop solar in Tamil Nadu

Generating since Aug 2026. Adhvanik Energy owns and runs it, and Exotic Fruits pays for each unit the plant generates, under a PPA. It is one of 2 Exotic Fruits plants on our project list.

Capacity
1,009 kWp
Installation
Metal sheet roof
Location
Krishnagiri, Tamil Nadu
Finance model
PPA / OPEX

This plant at a glance

Client
Exotic Fruits
Industry
FMCG
Capacity
1,009 kWp (DC), with 775 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Aug 2026
Status
Operational. Owned and run by Adhvanik Energy.

From 1,000 kW of capacity upward, a plant is usually built in many blocks, each with its own inverter. Exotic Fruits – Krishnagiri is in that class. 775 kW of inverters serve 1,009 kWp of modules: a DC/AC ratio of 1.30.

The plant in Krishnagiri started supplying the site in Aug 2026. A few months of readings will set its baseline. Its first weeks, in Aug 2026, were monsoon weeks.

The plant closest to it in size on our list is Mitsubishi Electric – Pune (1,000 kWp, Maharashtra). Zeeta Electrical – Sanand (519 kWp, Gujarat) was also commissioned in Aug 2026. In Tamil Nadu, in order of commissioning, MYK Laticrete – Perundurai comes before it and FUSO Glass – Sriperumbudur after.

On site

2 photos and a video clip from the plant. Select one to enlarge.

Engineering

How a 1,009 kWp plant is put together

Metal sheet is a light roof, and a 1,009 kWp array adds weight and wind load to purlins that were sized for the sheet alone. On a roof like this one in Krishnagiri, a structural engineer confirms the roof can take the load, and the structure is designed for the wind speed under IS 875.

Edge protection, lifelines and fixed walkways are part of the design, because crews work on a surface not built for foot traffic. The same arrangements serve the cleaning team for as long as a 1,009 kWp plant runs.

Our standard O&M scope has 24 to 26 cleaning cycles a year, more where the dust and the monsoon in Krishnagiri call for them, with AI-enabled checks on cleaning quality.

Finance model

Who owns the plant, and who runs it

A PPA moves the capital cost to us. The client at the plant has had a solar supply since Aug 2026, with the cost arriving as a per-unit charge on what the plant supplies.

For the host site the PPA is a long contract, with terms from 5 to 25 years.

Krishnagiri

Where Exotic Fruits – Krishnagiri sits on our list

Solar resource here
1,977 kWh/m² a yearAbout 1,586 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Krishnagiri; a roof plant at roof tilt differs.
Capacity range
1,000 kWp and above1,009 kWp here. 19 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
PPA / OPEXNo capital from the factory: it pays per unit generated.

No other plant in Krishnagiri is on our published list yet, so the Exotic Fruits plant is the town's one record here.

Across Tamil Nadu our list holds 9 plants in 6 towns, commissioned in 2026.

Consumer-goods lines such as filling, packing and conveying run through the day shift, so a roof plant produces when the load is already there.

The sizing question is how much the lines run on Sundays and shutdown days, because surplus on those days depends on the connection.

Projects

Other plants on the list

Elsewhere in Tamil Nadu

Other plants on metal sheet roofs

Common questions

What people ask about this plant

Is 1,009 kWp the module or the inverter size at this Krishnagiri plant?

Two figures describe the plant: 1,009 kWp on the module side and 775 kW (AC) on the inverter side. That is 30% more module capacity than inverter capacity (ratio 1.30), a normal design choice.

How is the plant at Krishnagiri mounted?

The list records a metal sheet roof. On sheet the structure is fixed through the sheet or, for a zero-leakage roof, held by clamps or adhesive, and it is designed for the wind speed under IS 875.

Does Adhvanik Energy work near Krishnagiri?

Yes. One plant is listed for Krishnagiri, among 9 in Tamil Nadu. The free 7-day feasibility study needs only your town and a typical monthly bill.

Free feasibility study

Want a 1,009 kWp plant on your own site?

The free 7-day study gives a site in Krishnagiri an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.

Call us+91 22 4618 3484Get a free feasibility study