Plastiblends – Palsana: 125 kWp solar plant in Gujarat, maintained by Adhvanik
Another company built this plant in Palsana. Adhvanik Energy's O&M team now keeps it running for Plastiblends. It is one of 6 Plastiblends plants on our project list.
- Capacity
- 125 kWp
- Installation
- Metal sheet roof
- Location
- Palsana, Gujarat
- Service
- O&M only
This plant at a glance
- Client
- Plastiblends
- Industry
- Polymer
- Capacity
- 125 kWp (DC), with 100 kW (AC) of inverters
- Commissioned
- Jul 2022
- Status
- Built by another company. Adhvanik Energy maintains it. O&M only
The Plastiblends plant is a small plant by the standard of the list: 125 kWp, one roof or one block. The array is 25% larger than the inverters, a DC/AC ratio of 1.25.
Commissioned in Jul 2022, the plant has several seasons of data. The question now is whether performance ratio has held steady. Jul 2022 was a monsoon month, so early output ran under cloud.
For scale, the nearest match in capacity is Blink Infra – Bhokapur (125 kWp, Uttar Pradesh). Plastiblends – Palsana (223 kWp) and Plastiblends – Palsana (463 kWp) were also commissioned in Jul 2022.
Solar in the area: Gujarat · Surat and Palsana. It is also listed in the full project list.
O&M
Our O&M scope at a plant we did not build
Plants built by other companies are part of our O&M work. At Plastiblends – Palsana the job is upkeep and performance: the plant is monitored on Asset Connect, and our engineers respond to faults.
Maintenance for a plant like the plant is set up as an AMC, an annual maintenance contract. Where the owner holds a warranty from the original builder or the module maker, we set the scope around it so the two do not overlap.
A plant in Palsana is only as good as its upkeep: inspections of connectors and inverters, cleaning that follows the local dust, and Asset Connect alerts on a string that has gone quiet.
Finance model
How the plant is paid for
The list records this Palsana plant as O&M only. The finance model for the build sits in another company's contract, and ours covers upkeep.
Third-party AMCs include monitoring and a fixed maintenance scope, and contracts run up to 25 years.
Palsana
Palsana and the polymer sector
- Solar resource here
- 1,931 kWh/m² a yearAbout 1,614 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Palsana; a roof plant at roof tilt differs.
- Capacity range
- Under 250 kWp125 kWp here. 33 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Service
- O&M onlyOne team accountable for output, with a monthly report.
Palsana is a repeat location on the list, with 3 plants listed. Its one named sector is polymer.
Palsana is covered on the page for Surat and Palsana, which lists 5 plants.
Across Gujarat our list holds 12 plants in 7 towns, commissioned between 2022 and 2026.
Extrusion and moulding run for long shifts and draw steady power, which gives a solar plant a dependable daytime load.
Heat from the process can raise roof temperature, so the roof assessment looks at sheet condition and at ventilators close to the array.
Sector page: Plastics & polymers solar. Rules for Gujarat: solar policy.
Projects
Other plants on the list
Also in Palsana
- Plastiblends – Palsana, 223 kWpO&M only · Jul 2022
- Plastiblends – Palsana, 463 kWpO&M only · Jul 2022
Elsewhere in Gujarat
- MYK Laticrete – Vadodara450 kWp · Metal sheet roof · Sep 2026
- Zeeta Electrical – Sanand519 kWp · Metal sheet roof · Aug 2026
- West Coast – Surat, 162 kWpMetal sheet roof · Jun 2026
- Shrotra Enterprises – Sarigam1,300 kWp · Metal sheet roof · Aug 2025
Other plants we maintain but did not build
- Plastiblends – Daman, 200 kWpO&M only · Apr 2024
- Plastiblends – Daman, 67 kWpO&M only · Apr 2024
- ArcelorMittal Nippon Steel – Pune800 kW (AC) · O&M only · Apr 2024
- MTC – Bidadi, 100 kW (AC)O&M only · Apr 2024
Common questions
Questions about Plastiblends – Palsana
What does 125 kWp mean for the plant?
The Plastiblends plant has 125 kWp of modules (DC) feeding 100 kW of inverters (AC). Modules are quoted in kWp and inverters in kW. That is 25% more module capacity than inverter capacity (ratio 1.25), a normal design choice.
How is the plant at Palsana mounted?
The list records a metal sheet roof. On sheet the structure is fixed through the sheet or, for a zero-leakage roof, held by clamps or adhesive, and it is designed for the wind speed under IS 875.
Do you build plants in Gujarat?
Yes. 3 plants are listed for Palsana, among 12 in Gujarat. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 125 kWp plant
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
Terms used on this page
Free feasibility study
Want a 125 kWp plant on your own site?
Send your Gujarat town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.