Project · O&M only · Gujarat
Plastiblends – Palsana: 463 kWp solar plant in Gujarat, maintained by Adhvanik
Another company built this plant in Palsana. Adhvanik Energy's O&M team now keeps it running for Plastiblends. It is one of 6 Plastiblends plants on our project list.

- Capacity
- 463 kWp
- Installation
- Metal sheet roof
- Location
- Palsana, Gujarat
- Service
- O&M only
Size, roof and service
- Client
- Plastiblends
- Industry
- Polymer
- Capacity
- 463 kWp (DC), with 350 kW (AC) of inverters
- Commissioned
- Jul 2022
- Status
- Built by another company. Adhvanik Energy maintains it. O&M only
At 463 kWp, the plant covers a sizeable share of a factory roof, usually split across a few inverters. Its 463 kWp of modules feed 350 kW of inverters, a DC/AC ratio of 1.32.
The Plastiblends plant has run since Jul 2022. Module degradation and wear on inverters and cables now show in the record. Its first weeks, in Jul 2022, were monsoon weeks.
The plant closest to it in size on our list is Britannia – Puducherry (467 kWp, Puducherry). Plastiblends – Palsana (223 kWp) and Plastiblends – Palsana (125 kWp) were also commissioned in Jul 2022.
More on the area: Gujarat · Surat and Palsana. Find this plant in the projects index.
On site
3 photos from the plant. Select one to enlarge.
O&M
Maintaining a plant someone else built
Plastiblends – Palsana is a 463 kWp plant in Gujarat. A different company built it and it came to us for maintenance, so the plant record lists no build details and no finance model.
Our O&M contracts carry a 95% uptime guarantee and a performance-ratio guarantee. We respond remotely within 1 working day. If the fault cannot be fixed remotely, an engineer attends site within 2 working days. Contracts run up to 25 years.
On Asset Connect, a 463 kWp plant is read month on month: generation, irradiance and fault alerts, with performance ratio showing whether soiling or a fault is costing units.
Finance model
Who owns the plant, and who runs it
Neither CAPEX nor a PPA applies to us at this Palsana plant. The plant has its own history, and our contract is an AMC for keeping it generating.
Handing an existing plant to us means one team accountable for its output, with scope and guarantees set in the contract.
Palsana
Where Plastiblends – Palsana sits on our list
- Solar resource here
- 1,931 kWh/m² a yearAbout 1,614 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Palsana; a roof plant at roof tilt differs.
- Capacity range
- 250 to 500 kWp463 kWp here. 36 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Service
- O&M onlyOne team accountable for output, with a monthly report.
Besides the plant, our list has 2 other plants in Palsana. Its one named sector is polymer.
Palsana is covered on the page for Surat and Palsana, which lists 5 plants.
Gujarat has 12 projects on the list, across 7 towns. By roof, 11 on metal sheet roofs and 1 on RCC.
Extrusion and moulding run for long shifts and draw steady power, which gives a solar plant a dependable daytime load.
Heat from the process can raise roof temperature, so the roof assessment looks at sheet condition and at ventilators close to the array.
Sector page: Plastics & polymers solar. Rules for Gujarat: solar policy.
Projects
Related plants
Also in Palsana
- Plastiblends – Palsana, 223 kWpO&M only · Jul 2022
- Plastiblends – Palsana, 125 kWpO&M only · Jul 2022
Elsewhere in Gujarat
- MYK Laticrete – Vadodara450 kWp · Metal sheet roof · Sep 2026
- Zeeta Electrical – Sanand519 kWp · Metal sheet roof · Aug 2026
- West Coast – Surat, 162 kWpMetal sheet roof · Jun 2026
- Shrotra Enterprises – Sarigam1,300 kWp · Metal sheet roof · Aug 2025
Other plants we maintain but did not build
- Sansera Engineering – Manesar201 kWp · O&M only · Sep 2025
- ArcelorMittal Nippon Steel – Bahadurgarh600 kWp · O&M only · Oct 2024
- Plastiblends – Daman, 200 kWpO&M only · Apr 2024
- Plastiblends – Daman, 67 kWpO&M only · Apr 2024
Common questions
What people ask about this plant
Is 463 kWp the module or the inverter size at the Plastiblends plant?
Two figures describe this Palsana plant: 463 kWp on the module side and 350 kW (AC) on the inverter side. The modules exceed the inverter rating by about 32%, a DC/AC ratio of 1.32.
What does the roof mean for the 463 kWp plant at Palsana?
Metal sheet, per the list. On a roof like that the mounting is chosen per roof, and sheet condition is checked before any module goes on.
Does Adhvanik Energy work near Palsana?
Yes. 3 plants are listed for Palsana, among 12 in Gujarat. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 463 kWp plant
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
Terms used on this page
Free feasibility study
An existing plant that needs a maintainer?
Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.