Solar on metal sheet with no fixings through the roof

Polymer plants run under large metal sheet sheds. Re-roofing a production shed is expensive and disruptive, and a leak over a line in the monsoon is the risk a plant head worries about most.

A leak over a production line means downtime and damaged stock, and not just a repair. So Samruddhi wanted a zero-leakage solution: each roof left as watertight as it was before the plant went up.

Repeat builds raise the bar further. When a manufacturer adds solar unit by unit, each new roof has to work like the last: the same mounting method, the same access and the same reporting, so the maintenance team is not looking after three different systems.

Buying the plant was its own problem. More than 10 vendors bid with inconsistent specifications, which made them hard to compare. It was like comparing a base-model car with no airbags or power windows against a top-end model with six airbags and a sunroof.

The solution

How the plant was engineered

  • Structural-adhesive mounting

    The mounting rails are bonded to the sheet profile with a structural adhesive. Nothing passes through the sheet, so there are no fixings to seal.

  • Checked for wind load

    Without screws, the hold-down comes from the bond and the layout, so the structure is designed for the wind speed under IS 875, as applicable.

  • Walkways between rows

    Walkways and safety lines give cleaning crews and engineers access to every row without stepping on the sheet or the modules.

  • A roof designed for solar

    The client’s roof was purpose-designed for solar, with zero skylights and ventilators to work around, so most of its area was usable. The tilt was kept at 6°. The result was 3% lower project cost and 4% higher installed capacity for the same area than comparable installations.

  • One specification for every bidder

    Adhvanik gave the client a detailed specification list with exact quantities across more than 50 materials, so it could benchmark every vendor on the same basis. Adhvanik won the order on transparency and consistency.

Implementation

How it was delivered

Adhvanik designed, procured, built and commissioned the Kolhapur and Sangli plants and handed them over to Samruddhi Industries.

After handover, the owner can place the plants under our O&M contract, which can run up to 25 years.

Finance model

The client owns the plant (CAPEX)

Samruddhi owns its plants outright under CAPEX. For a manufacturer adding solar across several units, ownership turns each roof into a long-life asset, and the savings stay with the factory for the life of the plant. If a sheet ever has to be replaced, the owner of the roof and the owner of the plant are the same company, so the work can be planned without anyone else’s consent.

Our CAPEX projects return 25%+ IRR. A Pune plant returned 50%+ IRR and paid back in under 2 years. This case’s own figures are not published yet.

Compare CAPEX with the other finance models

Results

Samruddhi Industries plants on our published list

Main equipment: Axitec 550 Wp modules and Solis 110 kW inverters.

From our commissioning records. Capacity is DC (kWp) unless marked AC.
PlantLocationRoof / configurationFinance modelCapacityCommissioned
Samruddhi Industries – KolhapurKolhapur, MaharashtraMetal sheet roofCAPEX1,410 kWpSep 2025
Samruddhi Industries – SangliSangli, MaharashtraMetal sheet roofCAPEX800 kWpApr 2025
Samruddhi Industries – Samadhan Industries, MaharashtraAlta, MaharashtraMetal sheet roofCAPEX250 kWpJun 2026
Samruddhi Industries – ChittoorChittoor, Andhra PradeshNot on recordNot applicable: O&M service501 kWpBuilt by another company

Performance

The first year of operation

The plants have completed one year of operation.

Performance ratio (PR), from our monitoring records.
YearSamruddhi Unit 7 (1,410 kW)Samruddhi Unit 6 (800 kW)
2025–2679.55%77.83%

What happened next

An O&M contract and another build followed

Based on this performance, the client awarded Adhvanik the O&M contract for its Andhra Pradesh site at Chittoor, a plant Adhvanik did not build and now maintains.

It also awarded Adhvanik a build-and-maintain project at Samadhan Industries, part of the same group.

Photos

From the site

  • Solar plant: Samruddhi Industries – Samadhan Industries, Maharashtra, Alta, MaharashtraSamruddhi Industries – Samadhan Industries, Maharashtra, Alta, Maharashtra

Does this match your site?

This approach fits if

  • Your roof sheets are new or still under warranty
  • Your production can’t tolerate a leak
  • You plan solar across several units

Related pages

Where to read next

Free feasibility study

Solar on warrantied sheet roofs

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
Call us+91 22 4618 3484Get a free feasibility study