Blog

Solar blog for Indian factories: prices, policy, PPAs and payback

Our team's analysis of module prices, import duties, metering rules, PPAs and payback. Some posts go back to around 2016. Each shows when it was written, and an editor's note marks where the rules have changed since.

All posts

All posts, filtered by topic

  • Prices & policy. Customs duties, the ALMM list of approved module makers, net-metering rules, and what they do to the price of a plant.
  • Savings & finance. Electricity bills, payback, PPAs, and the ways a factory can pay for solar.
  • Industry & markets. Solar auctions, global module prices and the wider energy market.

How we treat older posts

Posts stay as written, with a note where rules have changed

  • The author's analysis stays intact. We fixed typing errors and broken links, and the arguments and numbers are as they were published. We also removed a few claims we can no longer verify and corrected obvious unit and date errors (marked where they change a number).
  • Editor's notes say what is different now. Where a duty, deadline or metering rule has changed, a dated note at the top of the post explains it and links the source.
  • Your numbers come from your bills. Old tariffs and prices in these posts are examples, not quotes. A feasibility study prices your own site at today's rates.
  • Spotted something out of date? Tell us which post and we will add a note.

Free feasibility study

See what today's rates mean for your own bills

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
Call us+91 22 4618 3484Get a free feasibility study