A 2020 worked example of what delaying a solar decision by a year costs a factory on a RESCO contract, in lost savings and in the price of each unit.

2 min readFrom our archive

Three clock faces showing time passing

“You may delay, but time will not” – Benjamin Franklin.

This phrase is probably overused, but it’s true - Time is money. And when you let time run out, and so does the money! Let’s keep this in mind before I begin today’s blog.

During the lockdown, our team has witnessed a renewed interest in our OPEX/RESCO model-based Solar PV system solutions.

Clients from across various spectrums of industries have been looking at their cost structure to figure ways to make cutbacks. Solar power has found prominence in these discussions.

Even though we are glad that many Executives and business owners are ready to have these serious discussions, there have been delays in execution and implementations.

In my attempt to understand why certain businesses were executing faster, while others remained non-committal even after completing technical and financial feasibility, I went back through deals our team had worked on.

I saw that businesses with prior experience of a solar installation or who have done their research and seen a few solar plants have executed PO’s and PPA’s within a couple of months of initiating discussions.

However, some businesses held back on taking the final decision. Some of the most common reasons were as follows:

  1. “We are struggling to run our factories with the labor shortage. We don’t have the time now”.
  2. “We will postpone to December as we are busy with some other projects.”
  3. “We are not sure of the future of the situation; we want to wait and see how things shape up.”
  4. “I am not in the frame of mind to discuss.”
  5. “The savings are great, but we have decided to postpone.”

Even though newer customers decided to delay signing, some clients we had approached a couple of years ago approached us again and signed on at a rapid pace! During my discussions with one such client, we brainstormed on the cost impact of this delay.

Here are some of the basic details of the project:

Project details: 745.5 kWp plant, DISCOM tariff ₹6.8, RESCO tariff ₹3.75, saving ₹3.05 a unit, ₹32.76 lakh a year

Since, this project was delayed for one year, we calculated the notional savings loss for 1 year at ₹32.76 lakh and computed its effect on the PPA tariff when the loss was spread over multiple time periods.

Savings lost in one year, ₹32.76 lakh, and its effect on the PPA rate when spread over one year (₹3.05) or ten years (30 paise)

Hence, even though we charge ₹3.75 per unit, adding the cost of delay for one year, amounted to a notional cost of 30 paise a unit. Hence, power was being procured at ₹4.05 only because of a delay! This was a fascinating data point that most businesses fail to account for when looking at projects.

This proves that Solar Projects commissioned using the RESCO model, that helps consumers save costs with zero investments, get more expensive simply because the management delays decision-making.

Now does it make sense?

Delay = time running out = money wasted

If you are a consumer and have questions about the RESCO/OPEX model or would like to get a quote, get in touch with our team. We would be glad to help.

Free feasibility study

Start with your factory’s electricity bill

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
Call us+91 22 4618 3484Get a free feasibility study